PORCELAIN
VENEER RESTORATION PREPARATION & CEMENTATION
Part 2 |
|
|
Step
7. Apply 1 coat of ONE-STEP®
or ONE-STEP PLUS to the internal surface. |
 |
Step
8. Air dry. |
 |
Step
9. Light-cure for 10 seconds. |
 |
Step
10. Line inside of veneer with Light-cured
Base Paste only. Do not use Catalyst*. |
 |
Step
11. Seat
veneer with gentle, passive pressure. Remove excess cement
from margin immediately |
 |
Step
12. Light-cure
each surface of the restoration for 40 seconds or longer.
|
| |
**
Use Dual-cured Clear Catalyst Paste with Base Paste when
ceramic thickness is greater than 3mm. |
| |
|
| |
|
| |
|
| |
|
| |
|